Search Criteria

NSN/NIIN No.:
Part No. :
(13-16 digit NSN/9 digit NIIN)
5925-01-589-16145940-00-993-9073
NSNDescriptionAssign Date
5940-01-087-4253COVER,TERMINAL BOARD12/17/1979
NSNDescriptionDetailOpen Solicitations
5940-01-087-4253COVER,TERMINAL BOARD = Manual available.0
CompanyAward DateQuantityPriceContractDelivery Date
Free Trial05/06/2010Free TrialFree TrialSPM74001D9711
For additional information Register for Free Trial
Part NumberCompanyCAGE
1580460-1HONEYWELL INTERNATIONAL, INC64547
1580460-1ALLIED SIGNAL INC AEROSPACE EQUIPMENT SYSTEMS EATO83298
For additional information Register for Free Trial
CodeDefinition
ACQUISITION METHOD CODE.
'All Departments3ACQUIRE DIRECTLY FROM THE ACTUAL MANUFACTURER, WHETHER OR NOT THE PRIME CONTRACTOR IS THE ACTUAL MANUFACTURER.
ACQUISITION METHOD SUFFIX CODE.
'All DepartmentsRTHE DATA OR THE RIGHTS TO USE THE DATA NEEDED TO PURCHASE THIS PART FROM ADDITIONAL SOURCES ARE NOT OWNED BY THE GOVERNMENT AND IT HAS BEEN DETERMINED THAT IT IS UNECONOMICAL TO PURCHASE THEM. VALID AMCS: 1, 2, 3, 4 AND 5.
MAJOR ORGANIZATIONAL ENTITY.
ArmyDAArmy
NavyDNNavy
Defense Logistics Agency.DSDefense Logistics Agency.
PRICE
All DepartmentsPrice135.87
PRECIOUS METALS INDICATOR CODES.
All DepartmentsAItem does not contain Precious Metal.
CRITICALITY CODE.
All Departments
AUTOMATIC DATA PROCESSING EQUIPMENT.
All Departments
ELECTROSTATIC DISCHARGE CODE.
All Departments
HAZARDOUS MATERIALS INDICATOR CODE.
All DepartmentsNIndicates there is no data in the HMIRS and the NSN is in a FSC not generally suspected of containing hazardous materials.
DEMILITARIZATION CODE.
All DepartmentsANo-USML/Non-CCLI – No DEMIL or DoD TSC required. Department of Commerce may impose licensing requirements to certain destinations. (Note 9).
For additional information Register for Free Trial
COVER,TERMINAL BOAR MIL-STD-130N DATED 17 DEC 2007. IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY DSCR MAY NOT HAVE AN APPROVED BIDSET FOR THIS NSN. 1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAW ANSI/ASQ Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO DEFECTS IS REQUIRED 2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE FOR REJECTION OF THE ENTIRE CONTRACT QUANTITY.