Search Criteria

NSN/NIIN No.:
Part No. :
(13-16 digit NSN/9 digit NIIN)
5340-01-024-85445340-01-022-0094
NSNDescriptionAssign Date
5340-01-024-2390COVER,ACCESS07/07/1976
NSNDescriptionDetailOpen Solicitations
5340-01-024-2390COVER,ACCESS0
CompanyAward DateQuantityPriceContractDelivery Date
Free Trial12/07/2009Free TrialFree TrialSPM4A710M3825 01/16/2013
For additional information Register for Free Trial
Part NumberCompanyCAGE
53-46521-7THE BOEING COMPANY76301
For additional information Register for Free Trial
NameValue
MATERIALALUMINUM ALLOY 7075
For additional information Register for Free Trial
CodeDefinition
ACQUISITION METHOD CODE.
'All Departments1SUITABLE FOR COMPETITIVE ACQUISITION.
ACQUISITION METHOD SUFFIX CODE.
'All DepartmentsGTHE GOVERNMENT HAS UNLIMITED RIGHTS TO THE TECHNICAL DATA AND THE DATA PACKAGE IS COMPLETE. VALID AMCS: 1 AND 2.
MAJOR ORGANIZATIONAL ENTITY.
Air ForceDFAir Force
Defense Logistics Agency.DSDefense Logistics Agency.
PRICE
All DepartmentsPrice5636.16
PRECIOUS METALS INDICATOR CODES.
All DepartmentsAItem does not contain Precious Metal.
CRITICALITY CODE.
All DepartmentsXThe item does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application.
AUTOMATIC DATA PROCESSING EQUIPMENT.
All Departments
ELECTROSTATIC DISCHARGE CODE.
All Departments
HAZARDOUS MATERIALS INDICATOR CODE.
All DepartmentsPIndicates there is no information in the HMIRS; however, the NSN is in a FSC in Table II of Federal Standard 313 and a MSDS may be required by the user. The requirement for a MSDS is dependent on a hazard determination of the supplier or the intended end use of the product.
DEMILITARIZATION CODE.
All DepartmentsQCommerce Control List Items (CCLI) – Mutilation to the point of scrap required outside the United States. In the United States, mutilation requirement determined by the DEMIL Integrity Code. DoD Trade Security Controls (TSC) required in the United States. (Note 8).
For additional information Register for Free Trial
COVER, ACCESS P/N 53-46521-7 Government First Article Preproduction approval required. Testing will be in accordance with applicable drawings, specifications and/or Engineering instructions. The first article offered shall be manufactured at the facilities in which production quantities are procured and produced under this contract. When submitting the first article(s) for government testing, a copy of the contract and all applicable drawings, specifications, engineering instructions, certifications, and inspection sheets shall be provided. Upon receipt and evaluation of the test report from the responsible government testing location, the contracting officer will provide final notification to the manufacturer. Any questions or concerns regarding the first article test requirements must be submitted through the contracting officer. Additional Wide Area Workflow (WAWF) instructions for government first article test CLIN: The contractor shall code the receiving report for government first article test CLIN in WAWF as Follows: Inspection at origin (Source)- Enter the DCMA office DODAAC listed on page 1 of the contract. Acceptance by other-Enter the issue by office DODAAC listed on page 1 of the contract. Ship to code-Enter the DODAAC of the test facility listed for the government first article test CLIN in the contract (See FAR Clause 52.209-4). FIRST ARTICLE TEST MARKING INSTRUCTIONS: FAT sample(s) packaging shall be clearly marked "FIRST ARTICLE TEST EXHIBIT(S) DO NOT POST TO STOCK!!!" in largest font possible with contrasting color to the packaging. Marking shall be located adjacent to the Package Shipping Label side and on at least one additional side of the package. DWG EXCEPTIONS & NOTES: 1. MARK & IDENTIFY PER MIL-STD-130 IN LIEU OF PS16001. DO NOT STEEL STAMP. 2. FABRICATE PER PS14034 IN LIEU OF MMS501. 3. FINISH SPECIFICATION 32-90000 WILL NOT BE FURNISHED. NO ADDITIONAL FINISH REQUIRED. DO NOT DRILL "MATE" WITH HOLES. TAG PART WITH NOTE STATING: DRILL ON INSTALLATION. FAT APPLIES: GOVERNMENT ADDITIONAL FAT INFORMATION: ATTN: CONTRACTOR AND SERVICE ACTIVITY TEST MONITIOR........................................ DISAPPROVED FIRST ARTICLE(S) SHALL BE RETURNED TO THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. APPROVED AND CONDITIONALLY APPROVED FIRST ARTICLE(S) SHALL BE RETAINED AT THE SERVICE TEST ACTIVITY UNTIL DISPOSITION INSTRUCTIONS ARE RECEIVED FROM THE PCO. IF DISPOSITION INSTRUCTIONS ARE NOT RECEIVED WITHIN 30 DAYS AFTER PROVIDING THE FIRST ARTICLE TEST REPORT TO DSCR, REQUEST THAT THE DSCR QA SPECIALIST BE NOTIFIED....................... IDENTIFY TO: MARK IAW MIL-STD-130N, DATED 17 DEC 2007. CONFIGURATION CONTROL APPLIES SEE CLAUSE 52.246-9G36 (SECTION I). SAMPLING: 1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAW ANSI/ASQ Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO DEFECTS IS REQUIRED 2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE FOR REJECTION OF THE ENTIRE CONTRACT QUANTITY. CRITICAL APPLICATION ITEM
Doc. NumberDoc. TypeDoc. Def.Doc. CodeDoc. DateAmdt. DateCage
PS17100DWGBASICSS10/19/200409/25/2006 76301
PS14034DWGBASICSS12/01/200309/25/2006 76301
PS17100DWGBASICSU01/13/199209/23/2006 76301
53-46521DWGBASICDD04/15/196809/18/2006 76301