|
|
 2915-00-215-2158 | RETAINER,DRAIN VALVE | 04/27/1973 |
|
 2915-00-215-2158 | RETAINER,DRAIN VALVE | = Manual available. | 0 |
|
 100084 | RETAINER, VALVE | DEFENSE & DEVELOPMENT ENTERPRISES LLC | 3 | 100084 | HARDWARE | GALI CORPORATION | 42 | 100084 | RETAINER, VALVE | DEFENSE & DEVELOPMENT ENTERPRISES LLC | 903 | 100084 | RETAINER | AVITAN CORP. | 3 | 100084 | RETAINER | CBOL CORPORATION | 3 | | DRAIN, RETAINER | COMTAC UNLIMITED, INC. | 1 | 100084 | FILTER | ALAMO AIRCRAFT, LTD. | 80 | 100084 | SCREW MACH | HAYWARD AND GREEN DEFENCE LTD | 346 | 100084 | RETAINER-KL | KAMTECH SYSTEMS LTD | 7 | For additional information Register for Free Trial
|
For additional information Register for Free Trial
|
 100084 | VERCO INDUSTRIES | 52764 | For additional information Register for Free Trial
|
 END ITEM IDENTIFICATION | AIRCRAFT,MODEL C118 | For additional information Register for Free Trial
|
 ACQUISITION METHOD CODE. | 'All Departments | 1 | SUITABLE FOR COMPETITIVE ACQUISITION. |
| ACQUISITION METHOD SUFFIX CODE. | 'All Departments | G | THE GOVERNMENT HAS UNLIMITED RIGHTS TO THE TECHNICAL DATA AND THE DATA PACKAGE IS COMPLETE. VALID AMCS: 1 AND 2. |
| MAJOR ORGANIZATIONAL ENTITY. | Air Force | DF | Air Force | Navy | DN | Navy | Defense Logistics Agency. | DS | Defense Logistics Agency. | U.S. Coast Guard. | GP | U.S. Coast Guard. |
| PRICE | | PRECIOUS METALS INDICATOR CODES. | All Departments | A | Item does not contain Precious Metal. |
| CRITICALITY CODE. | All Departments | X | The item does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application. |
| AUTOMATIC DATA PROCESSING EQUIPMENT. | All Departments | 0 | Represents items with no ADP components. NOTE: Codes 1 through 6 are only to be used when the item is Automatic Data Processing Equipment (ADPE) in its entirety and is limited to the type meeting only one of the definitions for codes 1 through 6. (See code 9). |
| ELECTROSTATIC DISCHARGE CODE. | | HAZARDOUS MATERIALS INDICATOR CODE. | All Departments | N | Indicates there is no data in the HMIRS and the NSN is in a FSC not generally suspected of containing hazardous materials. |
| DEMILITARIZATION CODE. | All Departments | A | No-USML/Non-CCLI – No DEMIL or DoD TSC required. Department of Commerce may impose licensing requirements to certain destinations. (Note 9). |
| For additional information Register for Free Trial |
|  | | RETAINER, DRAIN VALVE "THE SOURCES/MATERIALS IF LISTED ON THE SPECIFICATION, STANDARDS AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. ANY SUBSITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY." AN UNRESTRICTED TECHNICAL DATA PACKAGE IS AVAILABLE FOR THIS NSN - BARE ITEM MARKINGS SHALL BE PER MIL-STD-130N OR LATER, PARA 4, USING THE METHODS SPECIFIED ON THE APPLICABLE DRAWING(S). CONFIGURATION CONTROL APPLIES SEE CLAUSE 52.246-9G36 (SECTION I). ARTICLES TO BE SUBMITTED: 2EA ILO 3EA ARTICLES TO BE FURNISHED HEREUNDER SHALL BE MANUFACTURED, TESTED AND INSPECTED IN ACCORDANCE WITH THE DRAWING REVISION CITED IN THE CONTRACT, ALL DETAILS AND SPECIFICATIONS REFERENCED THERE IN. I. QUALITY/INSPECTION REQUIREMENTS: A. FIRST ARTICLE TESTING APPLIES. B. MANDATORY INSPECTION PARAGRAPH III APPLIES. II. SUPPLEMENTAL REQUIREMENTS: A. THE FIRST ARTICLE OFFERED MUST BE MANUFACTURED AT THE FACILITIES IN WHICH THAT ITEM IS TO BE PROCURED UNDER THE CONTRACT, OR IF THE FIRST ARTICLE IS A COMPONENT NOT MANUFACTURED BY THE CONTRACTOR, SUCH COMPONENT MUST BE MANUFACTURED AT THE FACILITIES IN WHICH THE COMPONENT IS TO BE PRODUCED FOR THE CONTRACT. A CERTIFICATION TO THIS EFFECT MUST ACCOMPANY EACH FIRST ARTICLE WHICH IS OFFERED. B. THE CONTRACTOR SHALL IDENTIFY ON THE PROCESS/OPERATION SHEETS ALL MANUFACTURING SOURCES PERFORMING PROCESSES/OPERATIONS OUTSIDE OF THEIR FACILITIES. THESE SHEETS SHALL NOT BE REVISED OR ALTERED AFTER THE SUCCESSFUL COMPLETION OF FIRST ARTICLE OR PRODUCTION LOT TESTING WITHOUT APPROVAL FROM THE ENGINEERING SUPPORT ACTIVITY VIA THE PCO. C. THE INSPECTION METHOD SHEETS WHICH LIST THE CHARACTERISTICS OF EACH ITEM PRODUCED UNDER THE CONTRACT SHALL HAVE SERIAL NUMBER TRACEABILITY TO THE RAW MATERIAL, OR FORGING. IN ADDITION, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPLETED INSPECTION METHOD SHEETS SHOWING THE ACTUAL DIMENSIONS TAKEN. D. SEE MIL-HDBK-831 DATED 23 APR. 1999 FOR GUIDANCE IN PREPARATION OF THE FIRST ARTICLE TEST REPORT AND INCLUDE OBJECTIVE EVIDENCE OF COMPLETE DIMENSIONAL INSPECTION AND CHEMICAL/PHYSICAL PROPERTY TESTING INCLUDING COPIES OF ALL CERTIFICATIONS FOR THE MATERIAL AND PROCESSING PERFORMED AS CITED ON THE DRAWING. THIS REPORT SHALL BE MAILED TO THE GOVERNMENT TESTING ACTIVITY TOGETHER WITH THE FIRST ARTICLE EXHIBITS. E. FIRST ARTICLE WILL NOT SERVE AS A MANUFACTURING STANDARD. F. MARKING SHALL BE IAW MIL-STD-130 REV K, 15 JAN 2000, UNLESS OTHERWISE SPECIFIED IN ORIGINAL EQUIPMENT MANUFACTURER'S DRAWING. III. MANDATORY INSPECTION REQUIREMENTS: DURING FIRST ARTICLE PRODUCTION, MANDATORY INSPECTION IS REQUIRED TO BE ACCOMPLISHED BY THE CONTRACTOR AS FOLLOWS: A. LEVEL OF INSPECTION (LOI). CRITICAL CHARACTERISTICS: 100% INSPECTION SHALL APPLY. 2. MAJOR AND MINOR CHARACTERISTICS-LOI SHALL BE I/A/W A SAMPLING PLAN ACCEPTABLE TO THE QAR. B. MAJOR AND MINOR CHARACTERISTICS SHALL BE DEFINED BY THE CONTRACTOR SUBJECT TO QAR CONCURRENCE, UNLESS DEFINED ON APPLICABLE DRAWINGS AND ASSOCIATED SPECIFICATIONS. IV. UNLESS EXPRESSLY PROVIDED FOR ELSEWHERE IN THIS CLAUSE, EQUIPMENT SUCH AS: FIXTURES, JIGS, DIES, PATTERNS, TEMPLATES, MYLARS, SPECIAL TOOLING, TEST EQUIPMENT, OR ANY OTHER MANUFACTURING AID REQUIRED FOR THE MANUFACTURE AND/OR TESTING OF THE SUBJECT ITEM(S) WILL NOT BE PROVIDED BY THE GOVERNMENT OR ANY OTHER SOURCE AND IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE FOREGOING APPLIES NOTWITHSTANDING ANY REFERENCE TO SUCH EQUIPMENT OR THE FURNISHING THEREOF THAT MAY BE CONTAINED IN ANY DRAWING OR REFERENCED SPECIFICATION. A. FIRST ARTICLE INSPECTION/TEST CRITERIA: THE FOLLOWING TESTS SHALL BE PERFORMED UNDER THE FIRST ARTICLE APPROVAL CLAUSE OF THE CONTRACT: 1. FORM 2. FIT (INSTALLATION OF PARTS TO ENSURE PROPER MATING WITH THE RELATED COMPONENTS). 3. COMPLIANCE WITH THE DRAWING REVISION CITED IN THE CONTRACT DRAWING, ASSOCIATED DRAWINGS AND SPECIFICATIONS THEREIN, INCLUDING BUT NOT LIMITED TO, DIMENSIONS, MATERIAL, HEAT TREAT, FINISH, AND OTHER REQUIRED PROCESSES. B. QUANTITY OF SAMPLES TO BE SUBMITTED FOR TESTING IS THREE. 1. CONDITIONS FOR WAIVER OF FIRST ARTICLES ARE: A. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE. B. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE PRIME CONTRACTOR FOR DELIVERY TO THE GOVERNMENT, DOD, AIR FORCE. C. OFFERORS CURRENTLY IN PRODUCTION OF THE SAME ARTICLE FOR A GOVERNMENT, DOD, AIR FORCE CONTRACT AND WHO HAVE RECEIVED FIRST ARTICLE APPROVAL UNDER THE EXISTING CONTRACT. D. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE PROVIDING ARTICLES THUS FURNISHED HAVE EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE, IN THE OPINION OF THE GOVERNMENT. E. PROVIDED NOT MORE THAN THIRTY-SIX (36) MONTHS HAVE ELAPSED SINCE COMPLETION OF THE CONTRACT. C. OFFERORS CURRENTLY IN PRODUCTION OF THE SAME ARTICLE FOR A GOVERNMENT, DOD, AIR FORCE CONTRACT AND WHO HAVE RECEIVED FIRST ARTICLE APPROVAL UNDER THE EXISTING CONTRACT. D. OFFERORS WHO HAVE PREVIOUSLY FURNISHED PRODUCTION QUANTITIES OF THE SAME ARTICLE TO THE GOVERNMENT, DOD, AIR FORCE PROVIDING ARTICLES THUS FURNISHED HAVE EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE, IN THE OPINION OF THE GOVERNMENT. E. PROVIDED NOT MORE THAN THIRTY-SIX (36) MONTHS HAVE ELAPSED SINCE COMPLETION OF THE CONTRACT. FIRST ARTICLE TEST SHIPPING INSTRUCTIONS: CONTRACTOR SHALL CLEARLY IDENTIFY THE FIRST ARTICLE EXHIBIT SHIPPING CONTAINER, USING LARGE LETTERING AND A RED PERMANENT MARKER AS FOLLOWS: "FIRST ARTICLE EXHIBIT DO NOT POST" FIRST ARTICLE EXHIBIT SHALL BE SENT TO: DODAAC CODE-N65923 IN SERVICE SUPPORT CENTER CHERRY POINT FIRST ARTICLE TEST-STA. 31B ATTN: First Article/Production Lot Test Coordinator Phone (252) 464-7748 BLDG 154B CLEVELAND DR. MCAS CHERRY POINT, NC 28533 D. NOTIFICATION OF SHIPMENT FOR GOVERNMENT TESTING: 1. FIRST ARTICLE DELIVERY DUE WITHIN NINETY (90) CALENDAR DAYS FROM DATE OF CONTRACT. 2. THIRTY (30) CALENDAR DAYS PRIOR TO SHIPMENT OF FIRST ARTICLE SAMPLES, THE CONTRACTOR SHALL NOTIFY THE TEST FACILITY, IN WRITING OF THE ANTICIPATED SHIPPING DATE, WITH AN INFORMATION COPY TO THE PCO. THE CONTRACTOR SHALL ALSO ARRANGE FOR PRELIMINARY INSPECTION OF TEST SAMPLES BY THE CAO/QAR. 3. UPON SHIPMENT OF FIRST ARTICLE SAMPLES, THREE (3) COPIES OF THE MATERIAL INSPECTION AND RECEIVING REPORT (DD250) BEARING THE QAR SIGNATURE AND INDICATION OF PRELIMINARY INSPECTION, SHALL BE FORWARDED TO THE TEST FACILITY. THE ENVELOPES SHALL BE CLEARLY MARKED: DO NOT OPEN IN MAILROOM. 4. WITHIN NINETY (90) CALENDAR DAYS AFTER RECEIPT OF SAMPLES, THE TEST SITE SHALL COMPLETE TESTING/EVALUATION AND SUBMIT (2) COPIES OF THEIR REPORT WITH CONCLUSIONS AND RECOMMENDATIONS TO PCO. E. DISPOSITION OF FIRST ARTICLES: 1. APPROVED FIRST ARTICLES WILL BE FORWARDED TO DLA SUPPLY. 2. DISAPPROVED FIRST ARTICLES WILL BE RETURNED TO THE CONTRACTOR. END OF QUALITY ASSURANCE INSTRUCTIONS......... . DETAIL DRAWING DATA LISTS |
|
| | 100084 | DWG | BASIC | DD | 12/12/1968 | 09/18/2006 | 13598 |
|
|
|
|
|
|
|
|