|
|
 1660-01-183-4273 | DUCT ASSEMBLY,AIR CONDITIONING-H | 07/06/1984 |
|
 1660-01-183-4273 | DUCT ASSEMBLY,AIR CONDITIONING-H | | 0 |
|
|
|
 4A10193-103A | LOCKHEED MARTIN CORP | 98897 | For additional information Register for Free Trial
|
 END ITEM IDENTIFICATION | C-5B AIRCRAFT | SIDE FOR WHICH DESIGNED | LEFT SIDE | AIRCRAFT LOCATION | WATER SEPARATOR INLET, AIR CONDITIONER | AIRCRAFT MISSION DESIGN SERIES | C-5B | SPECIAL FEATURES | 8.000 IN. OD | MATERIAL | ALUMINUM ALLOY 6061 | MATERIAL DOCUMENT AND CLASSIFICATION | QQ-A-250/11 FED SPEC SINGLE MATERIAL RESPONSE | For additional information Register for Free Trial
|
 ACQUISITION METHOD CODE. | 'All Departments | 1 | SUITABLE FOR COMPETITIVE ACQUISITION. |
| ACQUISITION METHOD SUFFIX CODE. | 'All Departments | G | THE GOVERNMENT HAS UNLIMITED RIGHTS TO THE TECHNICAL DATA AND THE DATA PACKAGE IS COMPLETE. VALID AMCS: 1 AND 2. |
| MAJOR ORGANIZATIONAL ENTITY. | Air Force | DF | Air Force | Defense Logistics Agency. | DS | Defense Logistics Agency. |
| PRICE | All Departments | Price | 15720.25 |
| PRECIOUS METALS INDICATOR CODES. | All Departments | A | Item does not contain Precious Metal. |
| CRITICALITY CODE. | All Departments | X | The item does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application. |
| AUTOMATIC DATA PROCESSING EQUIPMENT. | | ELECTROSTATIC DISCHARGE CODE. | | HAZARDOUS MATERIALS INDICATOR CODE. | All Departments | N | Indicates there is no data in the HMIRS and the NSN is in a FSC not generally suspected of containing hazardous materials. |
| DEMILITARIZATION CODE. | All Departments | Q | Commerce Control List Items (CCLI) – Mutilation to the point of scrap required outside the United States. In the United States, mutilation requirement determined by the DEMIL Integrity Code. DoD Trade Security Controls (TSC) required in the United States. (Note 8). |
| For additional information Register for Free Trial |
|  | | DUCT ASSEMBLY,AIR CONDITIONING LOCKHEED MARTIN CORP, CAGE 98897 Government First Article Preproduction approval required. Testing will be in accordance with applicable drawings, specifications and/or Engineering instructions. The first article offered shall be manufactured at the facilities in which production quantities are procured and produced under this contract. When submitting the first article(s) for government testing, a copy of the contract and all applicable drawings, specifications, engineering instructions, certifications, and inspection sheets shall be provided. Upon receipt and evaluation of the test report from the responsible government testing location, the contracting officer will provide final notification to the manufacturer. Any questions or concerns regarding the first article test requirements must be submitted through the contracting officer. Additional Wide Area Workflow (WAWF) instructions for government first article test CLIN: The contractor shall code the receiving report for government first article test CLIN in WAWF as Follows: Inspection at origin (Source)- Enter the DCMA office DODAAC listed on page 1 of the contract. Acceptance by other-Enter the issue by office DODAAC listed on page 1 of the contract. Ship to code-Enter the DODAAC of the test facility listed for the government first article test CLIN in the contract (See FAR Clause 52.209-4). FIRST ARTICLE TEST MARKING INSTRUCTIONS: FAT sample(s) packaging shall be clearly marked "FIRST ARTICLE TEST EXHIBIT(S) DO NOT POST TO STOCK!!!" in largest font possible with contrasting color to the packaging. Marking shall be located adjacent to the Package Shipping Label side and on at least one additional side of the package. NOTICE TO CONTRACTOR: THE PROCUREMENT ITEM DESCRIPTION EXCEEDS THE ANSI STANDARD FOR EDI TRANSACTIONS (840 REQUEST FOR QUOTE AND 850 PURCHASE ORDER); VENDORS THAT ARE RECEIVING THIS INFORMATION VIA AN EDI 840 OR 850 CAN OBTAIN THE COMPLETE ITEM DESCRIPTION BY ACCESSING THE SOLICITATION/AWARD FROM THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT: (https://www.dibbs.bsm.dla.mil) EXCEPTIONS: STM06-101 CANCELLED USE QQ-A-225/8. DS30000 CANCELLED USE STP51-302. DS30004 CANCELLED USE STP41-400. STP51-302 USE ASE AMS-STD-2219A. 200415485 GENERAL ENGINEERING NOTES 1,3 & 12 APPLY. FIRST ARTICLE TEST REQUIREMENTS: MARK IAW MIL-STD-130N, DATED 17 DEC 2007. CONFIGURATION CONTROL APPLIES SEE CLAUSE 52.246-9G36 (SECTION I). 1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAW ANSI/ASQ Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO DEFECTS IS REQUIRED 2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE FOR REJECTION OF THE ENTIRE CONTRACT QUANTITY. . |
|
| | DS30000 | DWG | BASIC | ST | 10/19/1998 | 10/08/2006 | 98897 | STP51-302 | DWG | BASIC | SS | 10/03/2003 | 10/07/2006 | 98897 | STP51-400 | DWG | BASIC | SS | 05/07/1999 | 10/07/2006 | 98897 | LIMITEDUSE | DWG | BASIC | DD | 10/25/2005 | 09/25/2006 | 13873 | 200415485 | DWG | BASIC | RE | 02/17/2005 | 09/25/2006 | 98752 | STP58-405 | DWG | BASIC | SS | 02/13/1981 | 09/25/2006 | 98897 | DS5037 | DWG | BASIC | ST | 01/04/1973 | 09/25/2006 | 98897 | STM26-103 | DWG | BASIC | SS | 03/31/1967 | 09/25/2006 | 98897 | STP59-201 | DWG | BASIC | SS | 08/01/1966 | 09/25/2006 | 98897 | STP51-206 | DWG | BASIC | SS | 03/01/1988 | 09/24/2006 | 98897 |
|
|
|
|
|
|
|
|